Fire Chief’s Preliminary Fire Review
Prior to submitting a site plan for Comprehensive Site Plan Review, a pre-submission review of the plans by the Fire Chief is required. Approval by the Fire Chief is prerequisite to final plan submission. The purpose of this review is to allow the general fire protection scheme to be reviewed before the review of the final plans. Please submit the following to the Department of Community Development:
Two sets of preliminary plans, sufficient in detail to show the general layout of proposed facilities including buildings, parking areas, entrances, travelways and the water system, particularly the location of existing and proposed fire hydrants. Please include:
- Number of stories
- Square footage per floor
- Construction type VCC
- Building height and highest point
- See Application
[13MB] for additional requirements
Fire flow information:
- NFF Worksheet (less than 2500 GPM)
[31MB]
- NFF Worksheet (more than 2500 GPM)
[27MB]
- ISO Fireflow calculations
[458MB]
Fire Chief’s pre-submission application/checklist [13MB]
If the project includes storage facilities, please include the Storage Limitations form. [284MB]